Posted: Aug 20, 2020
With the crane ready preparation began on the new Intellian VSAT antennas for lifting to the main mast and continuing with through-ship cable installation. Removing inspection hatches on the upper main mast and opening sealed bulkhead cable ways into the wheelhouse. Installing new VSAT antennas, and removing remaining two F55 antennas.
read more
|
|
Posted: Aug 18, 2020
Days 3 / 4 With the momentum building, and the lifting crane scheduled, the next steps included scouting for through-ship cable routes and starting to...